Cannon Beach Station 2
Station 2 – Arch Cape
(No Picture At This Time)
Fire Station 2 (Sub-Station) is located at 72979 Hwy. 101 (Oregon Coast Hwy) and built in 2014.
ENGINE 3626
2006 GMC C6500 4×4 / E-One Super Lynx (SE3594) 750 GPM pump, 320 gallon water tank and 20 gallons of foam.
BRUSH 3276
2022 Core Spire 4×4 / Mallory Fire 250 GPM pump and 500 gallon water tank.