
Brighton Snow Goose Street Structure Fire
Brighton Structure Fire
Around 20:13 on October 1st, 2012 Adcom alerted Brighton Fire Rescue District to a structure fire at 5254 Snow Goose St. Engine 52 arrived on scene and advised of flames through the roof and a all clear on Division 1. Battalion 51 requested dispatch for a working fire tone. Engine 52 established a water supply and entered making a quick and aggressive attack confining the fire to an upstairs master bedroom with extension to the attic. Engine 54 set up a backup line to the interior and Engine 53 established a RIT team. The fire was under control within 20 minutes and is under investigation. No injuries were reported.
Units on Scene: Battalion 51, Chief 55, EMS 53, Tower 51, Engine 52, Engine 53, Engine 54 & Medic 57